Setting Low-Stock Reorder Points for Plates and Lumber
A low-stock alert is only as good as the level behind it. Here's a simple, practical way to set reorder points that warn you in time, without tying up cash.
5 min read
Lumber is quoted per thousand board feet but used one piece at a time. Here's how to connect the two so you always know what your stock and your jobs really cost.
Lumber is usually the largest material cost in a truss, and its price moves more than almost anything else a plant buys. Yet in many plants the cost of lumber in stock, and the lumber cost of a specific job, is an educated guess. The tools to fix that are simple arithmetic and a consistent habit. This article explains the units, the conversions and a practical way to keep costs current.
A board foot is a unit of volume: one foot long, one foot wide and one inch thick, or 144 cubic inches. Lumber is traded using nominal dimensions, so a 2x4 counts as 2 inches by 4 inches for board-foot purposes, even though it actually measures less once it's dried and planed.
The formula for a piece is:
Board feet = thickness (in) × width (in) × length (ft) ÷ 12
MBF means one thousand board feet (the M is the Roman numeral for a thousand). Lumber prices are commonly quoted per MBF.
Some common examples:
| Piece | Calculation | Board feet |
|---|---|---|
| 2x4 x 8 ft | 2 × 4 × 8 ÷ 12 | 5.33 |
| 2x4 x 12 ft | 2 × 4 × 12 ÷ 12 | 8 |
| 2x6 x 16 ft | 2 × 6 × 16 ÷ 12 | 16 |
| 2x8 x 20 ft | 2 × 8 × 20 ÷ 12 | 26.67 |
Because you buy by the MBF but use by the piece, the most useful number on the floor is cost per piece. The conversion is:
Cost per piece = board feet per piece × price per MBF ÷ 1,000
Record the cost per piece against each lumber item in your inventory (grade, size and length). Once that's done, every count you keep also tells you a value.
It's tempting to keep one cost for "2x4", but prices can differ by species, grade, treatment and length. Machine-stress-rated lumber usually costs differently from visually graded lumber, and some lengths carry a premium. For cost tracking to mean anything, each item in your inventory should be specific: species or group, grade, size and length, and its own cost.
This also matches how truss design software lists material, which makes pick-list deduction much simpler.
Lumber you bought last month at one price may sit next to lumber you bought this week at another. Accountants have formal methods for this (such as FIFO or weighted average), and your accountant should decide which applies to your books. For running the plant day to day, many operations use a simple approach:
Whichever you choose, be consistent, and write down which method you use so everyone reads the numbers the same way.
With a count and a cost per piece for every item, your lumber inventory value is simply the sum of count × cost. That number is useful for more than accounting:
Because pick lists from your design software list every piece a job uses, the lumber cost of a job is the sum of each piece × its cost per piece. If you deduct pick lists from inventory when jobs start, you can calculate this at the same moment. That gives you:
Remember that the pick list is the plan. Waste, offcuts and substitutions add real cost on top. If you track scrap even roughly, you can add a waste allowance to your estimates based on your own history rather than a guess.
The hardest part of cost tracking isn't the math; it's keeping the numbers up to date. A few habits help:
Board feet and MBF are simple once they're written down. Convert price per MBF to cost per piece, track each grade and length separately, choose a costing method and stick to it, and update costs when material arrives. Do that and you'll always know what your stock is worth and what a job's lumber really cost.
Truss Plant Portal's inventory keeps a cost per piece on every plate and lumber item, shows the total value of what's on the floor, and deducts pick lists automatically, so the numbers stay current with very little effort.